loader

World Tenders & Procurement Opportunities

ACQUISITION OF SPARE PARTS FOR THE SIDI DAOUD AND METLINE & KCHABTA WIND POWER PLANTS.

World Biggest Tenders Source

This tender with title ACQUISITION OF SPARE PARTS FOR THE SIDI DAOUD AND METLINE & KCHABTA WIND POWER PLANTS. -- ACQUISITION DE DES PIECES DE RECHANGE POUR LES CENTRALES EOLIENNES DE SIDI DAOUD ET METLINE & KCHABTA. has been published on Bidding Source portal dated 27 Dec 2020 for the country of Tunisia. It has been categorized on Operation of a power plant. For similar tenders you can see tenders mentioned below of this page.

ACQUISITION DE DES PIECES DE RECHANGE POUR LES CENTRALES EOLIENNES DE SIDI DAOUD ET METLINE & KCHABTA.

General Information

ACQUISITION OF SPARE PARTS FOR THE SIDI DAOUD AND METLINE & KCHABTA WIND POWER PLANTS.
ACQUISITION DE DES PIECES DE RECHANGE POUR LES CENTRALES EOLIENNES DE SIDI DAOUD ET METLINE & KCHABTA.
Invitation to Bids
20 P 1052
Tunisia
27 Dec 2020
24 Feb 2021
French
Operation of a power plant

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Development of: Hazard Study of the TAC Goulette 2 Power Plant (lot 1) / Hazard Study of the Thyna Center (lot 2) / Hazard Study of the Fériana Center (lot 3) / Internal Operations… -- <h6>Élaboration de: Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12).</h6> Tunisia Development of: Danger Study of the TAC Goulette 2 Power Plant (lot 1) / Danger Study of the Thyna Center (lot 2) / Danger Study of the Fériana Center (lot 3) / Internal Operations Plan of the Cycle Center Combined Ghannouch (lot 4) / Internal Operations Plan of the Bouchemma Power Plant (lot 5) / Internal Operations Plan of the Sousse Production Group (stages A, B, C and D) (lot 6) / Plan of Internal Operations of the Bir M'Cherga Center (lot 7) / Environmental Depollution Study of the Thyna Center (lot 8) / Environmental Depollution Study of the Fériana Power Plant (lot 9) / Update of the Study of the Dangers of the power plant of the Rades Production Group (stages A and B) (lot 10) / Update of the Hazard Study of the Sousse Production Group (stages A, B,C and D) (lot 11) / Update of the Hazard Study of the Ghannouch Combined Cycle Center (lot 12). -- <br> Élaboration de : Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12). Tunisia Development of Danger Studies for the TAC Goulette 2, Thyna and Fériana plants (lot 1), Internal Operation Plans for the Combined Cycle of Ghannouch and the Sousse, Bouchemma and Bir M'Cherga plants (lot 2) and Studies of Environmental decontamination of the Thyna and Fériana gas turbine power plants (lot 3). -- Élaboration des Études De Danger des Centrales TAC Goulette 2, Thyna et Fériana (lot 1), des Plans d’Opération Interne du Cycle Combiné de Ghannouch et des Centrales de Sousse, Bouchemma et Bir M’Cherga (lot 2) et des Études de Dépollution Environnementale des Centrales à turbine à gaz de Thyna et Fériana (lot 3).. Tunisia Supply of 12 36 kV medium voltage modular cubicles in metal casing, prefabricated in the factory, with insulation and SF6 cut-off, comprising the following two lots: - Lot 1: 10 36 kV modular cells with SF6 insulation and cut-off for AE61 wind turbines in power plants. KCHABTA, METLINE and SIDI DAOUD. - Lot 2: 2 36 kV modular cubicles with insulation and SF6 cut-off for supplying SIDI SALEM hydraulic power plant auxiliaries. -- Fourniture de 12 cellules modulaires moyenne tension 36 kV sous enveloppe métallique, préfabriquées en usine, à isolation et coupure sous SF6 composée des deux lots suivants : - Lot 1 : 10 cellules modulaires 36 kV à isolation et coupure sous SF6 pour aérogénérateurs AE61 des centrales de KCHABTA, METLINE et SIDI DAOUD. - Lot 2 : 2 cellules modulaires 36 kV à isolation et coupure sous SF6 pour alimentation des auxiliaires centrale hydraulique de SIDI SALEM. Tunisia Establishment of an annual framework contract, renewable twice at most for the transport of STEG personnel, divided into the following three (03) los: -LOT 1- Transport of STEG personnel normal service and shift service of the TAC fériana plant. -LOT 2- Transport of STEG personnel between the TAC plant in Mornaguia and the town center of Sidi_Hsin. -LOT 3- Transport of STEG personnel from the kchabta wind power plant. -- Établissement d’un Marché Cadre annuel et renouvelable deux fois au maximum pour le transport du personnel STEG, réparties en trois (03) los suivants : -LOT 1- Transport du personnel STEG service normal et service de quart de la centrale TAC fériana. -LOT 2- Transport du personnel STEG entre la centrale TAC de Mornaguia et le centre de ville de Sidi_Hsin. -LOT 3- Transport du personnel STEG de la centrale Eolienne de kchabta. Tunisia ESTABLISHMENT OF A TWICE ANNUAL RENEWABLE FRAMEWORK MARKET FOR THE SUPPLY OF SYNTHETIC LUBRICATING OIL ISO VG 320 FOR THE WIND POWER PLANTS OF SIDI DAOUD, METLINE AND KCHABTA. -- ETABLISSEMENT D’UN MARCHE CADRE ANNUEL RENOUVELABLE DEUX FOIS D’APPROVISIONNEMENT EN HUILE SYNTHETIQUE DE GRAISSAGE ISO VG 320 POUR LES CENTRALES EOLIENNES DE SIDI DAOUD, METLINE ET KCHABTA. Tunisia ACQUISITION, INSTALLATION AND COMMISSIONING OF A PERIMETRIC VIDEO SURVEILLANCE SYSTEM IN POWER PLANTS. -- ACQUISITION, INSTALLATION ET MISE EN SERVICE D’UN SYSTÈME DE VIDÉOSURVEILLANCE PÉRIMÉTRIQUE À DANS LES CENTRALES ELECTRIQUES . Tunisia CONSTRUCTION OF A BUILDING FOR THE TRANSPORT SERVICE AND THE EXTENSION OF A POWER PLANT AT TOZEUR NAFTA INTERNATIONAL AIRPORT. -- CONSTRUCTION D’UN BATIMENT POUR LE SERVICE TRANSPORT ET L’EXTENSION D’UNE CENTRALE ELECTRIQUE A L’AEROPORT INTERNATIONAL DE TOZEUR NAFTA. Tunisia Establishment of an annual framework contract, renewable twice at most for the transport of STEG personnel, divided into the following three (03) los: -LOT 1- Transport of STEG personnel normal service and shift service of the TAC fériana plant. -LOT 2- Transport of STEG personnel between the TAC plant in Mornaguia and the town center of Sidi_Hsin. -LOT 3- Transport of STEG personnel from the kchabta wind power plant. -- Établissement d’un Marché Cadre annuel et renouvelable deux fois au maximum pour le transport du personnel STEG, réparties en trois (03) los suivants : -LOT 1- Transport du personnel STEG service normal et service de quart de la centrale TAC fériana. -LOT 2- Transport du personnel STEG entre la centrale TAC de Mornaguia et le centre de ville de Sidi_Hsin. -LOT 3- Transport du personnel STEG de la centrale Eolienne de kchabta. Tunisia Supply Spare Parts for Operation & Maintenance of 1MW Janbacher brand Gas Generator Power Plant at Mirpur site under Generator Division, DWASA. - DWASA/GD/2024-25/NOTICE-12(F/N:37.042.24) Bangladesh
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans