loader

World Tenders & Procurement Opportunities

Establishment of an annual framework contract, renewable twice at most for the transport of STEG personnel, divided into the following three (03) los: -LOT 1- Transport of STEG personnel normal service and shift service of the TAC fériana plant. -LOT 2- Transport of STEG personnel between the TAC plant in Mornaguia and the town center of Sidi_Hsin. -LOT 3- Transport of STEG personnel from the kchabta wind power plant.

World Biggest Tenders Source

This tender with title Establishment of an annual framework contract, renewable twice at most for the transport of STEG personnel, divided into the following three (03) los: -LOT 1- Transport of STEG personnel normal service and shift service of the TAC fériana plant. -LOT 2- Transport of STEG personnel between the TAC plant in Mornaguia and the town center of Sidi_Hsin. -LOT 3- Transport of STEG personnel from the kchabta wind power plant. -- Établissement d’un Marché Cadre annuel et renouvelable deux fois au maximum pour le transport du personnel STEG, réparties en trois (03) los suivants : -LOT 1- Transport du personnel STEG service normal et service de quart de la centrale TAC fériana. -LOT 2- Transport du personnel STEG entre la centrale TAC de Mornaguia et le centre de ville de Sidi_Hsin. -LOT 3- Transport du personnel STEG de la centrale Eolienne de kchabta. has been published on Bidding Source portal dated for the country of Tunisia. It has been categorized on Wind-power installation works & Construction works for power plants and heating plants & Construction work for power plant & Operation of a power plant. For similar tenders you can see tenders mentioned below of this page.

Établissement d’un Marché Cadre annuel et renouvelable deux fois au maximum pour le transport du personnel STEG, réparties en trois (03) los suivants : -LOT 1- Transport du personnel STEG service normal et service de quart de la centrale TAC fériana. -LOT 2- Transport du personnel STEG entre la centrale TAC de Mornaguia et le centre de ville de Sidi_Hsin. -LOT 3- Transport du personnel STEG de la centrale Eolienne de kchabta.

General Information

Establishment of an annual framework contract, renewable twice at most for the transport of STEG personnel, divided into the following three (03) los: -LOT 1- Transport of STEG personnel normal service and shift service of the TAC fériana plant. -LOT 2- Transport of STEG personnel between the TAC plant in Mornaguia and the town center of Sidi_Hsin. -LOT 3- Transport of STEG personnel from the kchabta wind power plant.
Établissement d’un Marché Cadre annuel et renouvelable deux fois au maximum pour le transport du personnel STEG, réparties en trois (03) los suivants : -LOT 1- Transport du personnel STEG service normal et service de quart de la centrale TAC fériana. -LOT 2- Transport du personnel STEG entre la centrale TAC de Mornaguia et le centre de ville de Sidi_Hsin. -LOT 3- Transport du personnel STEG de la centrale Eolienne de kchabta.
Invitation to Bids
20 P 1020
Tunisia
23 Feb 2021
French
Wind-power installation works , Construction works for power plants and heating plants , Construction work for power plant , Operation of a power plant

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

SUPPLY OF MECHANICAL SPARE PARTS FOR THE MAINTENANCE OF WIND TURBINES AT SIDI-DAOUD AND METLINE & KCHABTA WIND POWER PLANTS. - 24 P 1032 Tunisia Repair work on the seawater pumping station at the SOUSSE B power plant. - 24 E 4010 Tunisia Awarded - Recruitment of a firm responsible for controlling and supervising the solar power plant construction works market and the rural electrification works market - OP00281246 -- <b>Contract Value: TND 7894.6</b> Tunisia AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE -- <h6>Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).</h6> Tunisia Acquisition of small and large flow auxiliary steam expansion and desuperheating valves and spare parts for bypass valve for the Sousse Combined Cycle Power Plant. -- <h6>Acquisition de vannes de détente et désurchauffe vapeur auxiliaire petit et grand débit et pièces de rechange pour vanne de contournement pour la Centrale Cycle Combiné Sousse.</h6> Tunisia Development of: Hazard Study of the TAC Goulette 2 Power Plant (lot 1) / Hazard Study of the Thyna Center (lot 2) / Hazard Study of the Fériana Center (lot 3) / Internal Operations… -- <h6>Élaboration de: Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12).</h6> Tunisia Tunisia - the design and turnkey construction of two photovoltaic power plants mounted on the ground and connected to the STEG network, on the sites o… Tunisia Tunisia - CONSTRUCTION OF A PREMISES TO SHELTER THE ROBOTS CLEANING THE SOLAR PANELS OF THE TOZEUR I AND II PHOTOVOLTAIC POWER PLANTS. -- <br><b>CONSTRUCTION D'UN LOCAL POUR ABRITER LES ROBOTS DE NETTOYAGE DES PANNEAUX SOLAIRES DES CENTRALES PHOTOVOLTAÏQUES DE TOZEUR I ET II.</b> Tunisia LE DEMONTAGE DES ANCIENNES LIGNES DE VIE, LA FOURNITURE ET L’INSTALLATION DE KITS COMPLETS DE LIGNES DE VIE DES AEROGENERATEURS TYPE AE46 ET AE61 POUR LA CENTRALE EOLIENNE DE SIDI DAOUD, METLINE ET KCHABTA. -- <br><b> DISMANTLING OF OLD LIFELINES, SUPPLY AND INSTALLATION OF COMPLETE LIFELINE KITS FOR AE46 AND AE61 TYPE WIND GENERATORS FOR THE WIND POWER PLANT IN SIDI DAOUD, METLINE AND KCHABTA.</b> Tunisia LE CONTROLE TECHNIQUE ET SOLIDITE DES OUVRAGES GENIE CIVIL DES LIGNES AERIENNES HAUTE TENSION POUR LE RACCORDEMENT DES CENTRALES PHOTOVOLTAÏQUES ET DE LA SDEM DE SFAX. -- <br><b> TECHNICAL CONTROL AND SOUNDNESS OF CIVIL ENGINEERING WORKS OF HIGH VOLTAGE OVERHEAD LINES FOR THE CONNECTION OF PHOTOVOLTAIC POWER PLANTS AND SFAX SDEM.</b> Tunisia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans