loader

World Tenders & Procurement Opportunities

Development of Danger Studies for the TAC Goulette 2, Thyna and Fériana plants (lot 1), Internal Operation Plans for the Combined Cycle of Ghannouch and the Sousse, Bouchemma and Bir M'Cherga plants (lot 2) and Studies of Environmental decontamination of the Thyna and Fériana gas turbine power plants (lot 3).

World Biggest Tenders Source

This tender with title Development of Danger Studies for the TAC Goulette 2, Thyna and Fériana plants (lot 1), Internal Operation Plans for the Combined Cycle of Ghannouch and the Sousse, Bouchemma and Bir M'Cherga plants (lot 2) and Studies of Environmental decontamination of the Thyna and Fériana gas turbine power plants (lot 3). -- Élaboration des Études De Danger des Centrales TAC Goulette 2, Thyna et Fériana (lot 1), des Plans d’Opération Interne du Cycle Combiné de Ghannouch et des Centrales de Sousse, Bouchemma et Bir M’Cherga (lot 2) et des Études de Dépollution Environnementale des Centrales à turbine à gaz de Thyna et Fériana (lot 3).. has been published on Bidding Source portal dated 14 Mar 2021 for the country of Tunisia. It has been categorized on Construction work for power plant & Environmental services & Operation of a power plant & Gas turbines & Parts of gas turbines & Turbines and motors & Turbine installations & Turbine works & Construction works for power plants and heating plants. For similar tenders you can see tenders mentioned below of this page.

Élaboration des Études De Danger des Centrales TAC Goulette 2, Thyna et Fériana (lot 1), des Plans d’Opération Interne du Cycle Combiné de Ghannouch et des Centrales de Sousse, Bouchemma et Bir M’Cherga (lot 2) et des Études de Dépollution Environnementale des Centrales à turbine à gaz de Thyna et Fériana (lot 3)..

General Information

Development of Danger Studies for the TAC Goulette 2, Thyna and Fériana plants (lot 1), Internal Operation Plans for the Combined Cycle of Ghannouch and the Sousse, Bouchemma and Bir M'Cherga plants (lot 2) and Studies of Environmental decontamination of the Thyna and Fériana gas turbine power plants (lot 3).
Élaboration des Études De Danger des Centrales TAC Goulette 2, Thyna et Fériana (lot 1), des Plans d’Opération Interne du Cycle Combiné de Ghannouch et des Centrales de Sousse, Bouchemma et Bir M’Cherga (lot 2) et des Études de Dépollution Environnementale des Centrales à turbine à gaz de Thyna et Fériana (lot 3)..
Invitation to Bids
21 P 1002
Tunisia
14 Mar 2021
14 Apr 2021
French
Construction work for power plant , Environmental services , Operation of a power plant , Gas turbines , Parts of gas turbines , Turbines and motors , Turbine installations , Turbine works , Construction works for power plants and heating plants

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

ACQUISITION OF FIRE-RESISTANT HYDRAULIC OIL BASED ON TRIARYL PHOSPHATE ESTERS FOR STEAM TURBINES FOR STAGE B OF THE RADES PRODUCTION GROUP. - 24 P 1048 Tunisia acquisition of lifeboats equipped with motors and trolleys. - 26-2025 Tunisia ACQUISITION OF SPARE PARTS FOR THE FREIGHT ELEVATORS OF THE WIND TURBINES OF THE KCHABTA, METLINE AND SIDI DAOUD WIND POWER PLANTS - 24 P 1039 Tunisia SUPPLY OF MECHANICAL SPARE PARTS FOR THE MAINTENANCE OF WIND TURBINES AT SIDI-DAOUD AND METLINE & KCHABTA WIND POWER PLANTS. - 24 P 1032 Tunisia Repair work on the seawater pumping station at the SOUSSE B power plant. - 24 E 4010 Tunisia Awarded - Recruitment of a firm responsible for controlling and supervising the solar power plant construction works market and the rural electrification works market - OP00281246 -- <b>Contract Value: TND 7894.6</b> Tunisia Rental of equipment to provide environmental services. Tunisia AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE -- <h6>Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).</h6> Tunisia Acquisition of small and large flow auxiliary steam expansion and desuperheating valves and spare parts for bypass valve for the Sousse Combined Cycle Power Plant. -- <h6>Acquisition de vannes de détente et désurchauffe vapeur auxiliaire petit et grand débit et pièces de rechange pour vanne de contournement pour la Centrale Cycle Combiné Sousse.</h6> Tunisia Development of: Hazard Study of the TAC Goulette 2 Power Plant (lot 1) / Hazard Study of the Thyna Center (lot 2) / Hazard Study of the Fériana Center (lot 3) / Internal Operations… -- <h6>Élaboration de: Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12).</h6> Tunisia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans