loader

World Tenders & Procurement Opportunities

Execution of works for the rehabilitation and modernization of the microhydropower plant with an installed capacity of 9.9 MW from Turceni HPP, including the development of technical documentation and the supply of equipment/installations - 38637

World Biggest Tenders Source

This tender with title Execution of works for the rehabilitation and modernization of the microhydropower plant with an installed capacity of 9.9 MW from Turceni HPP, including the development of technical documentation and the supply of equipment/installations - 38637 has been published on Bidding Source portal dated 24 Jan 2025 for the country of Romania. It has been categorized on Hydro-electric plant construction work. For similar tenders you can see tenders mentioned below of this page.

General Information

Execution of works for the rehabilitation and modernization of the microhydropower plant with an installed capacity of 9.9 MW from Turceni HPP, including the development of technical documentation and the supply of equipment/installations - 38637
Invitation for Bids
Romania
24 Jan 2025
10 Mar 2025
English
Hydro-electric plant construction work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Execution of works for the rehabilitation and modernization of the microhydropower plant with an installed capacity of 9.9 MW from Turceni HPP, including the development of technical documentation and the supply of equipment/installations - 746043 Romania RETEHNOLOGIZARE CHE BRĂDIŞOR -- Hydro-electric plant construction work Romania Retehnologizare CHE Râul Mare Retezat -- Hydro-electric plant construction work Romania 181950-Awarded - France – Hydro-electric plant construction work – Construction de la Centrale Hydroélectrique de Péclet (Les Belleville - 73) -- <b>Contract Value: 5 525 178,00 EUR </b> France Turbine equipment – ​​Production, renovation and supply of parts and equipment for turbines and provision of special services for the needs of hydroelectric power plants on the lower Sava River for the period 2025 – 2027 - 121153 Slovenia Reinforcement work on the retaining wall in diaphragm wall of the 225kV substation of the Allal Al Fassi hydroelectric plant - 04890 Morocco Croatia – Electrical power systems design services – Development of a conceptual design for the Zaprešić hydroelectric power plant - 105961 Croatia Design and estimate documentation for the construction of a pedestrian trail leading from the area adjacent to the Shaki Hydroelectric Power Plant in the Sisian community to the Shaki Waterfall for the needs of… - 08449 Armenia Announcement of the average price for the contract to install and dismantle scaffolding at the Nam Theun 2 Hydroelectric Power Plant (NTN2), Lao PDR - PB67029 - 03271 Thailand Slovenia – Turbine equipment – ​​Production, renovation and supply of parts and equipment for turbines and provision of special services for the needs of hydroelectric power plants on the lower Sava River for the period 2025 – 2027 - 788997 Slovenia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans