loader

World Tenders & Procurement Opportunities

Joint awarding of the supply and installation, based on a technical-economic feasibility project, to be developed in executive form, of a BOP system for the Parma district heating network - Italy

World Biggest Tenders Source

This tender with title Joint awarding of the supply and installation, based on a technical-economic feasibility project, to be developed in executive form, of a BOP system for the Parma district heating network - Italy has been published on Bidding Source portal dated 29 Jul 2024 for the country of Italy. It has been categorized on Gas turbines. For similar tenders you can see tenders mentioned below of this page.

General Information

Joint awarding of the supply and installation, based on a technical-economic feasibility project, to be developed in executive form, of a BOP system for the Parma district heating network - Italy
Invitation for Bids
Italy
29 Jul 2024
24 Sep 2024
English
Gas turbines

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Joint awarding of the supply and installation, based on a technical-economic feasibility project, to be developed in executive form, of a BOP system for the Parma district heating network Italy Joint assignment of the on-site supply, on the basis of a technical-economic feasibility project, to be developed in executive order, of a BOP system for the Parma district heating network - 347787-2024 Italy Joint assignment of the on-site supply, on the basis of a technical-economic feasibility project, to be developed in executive order, of a BOP system for the Parma district heating network - 271851-2024 Italy Gas turbines - Joint assignment of the on-site supply, on the basis of a technical-economic feasibility project, to be developed in executive order, of a BOP system for the Parma district heating network - 213960-2024 Italy Fornitura in opera di un cogeneratore a gas metano da c.a. 350 kW -- Gas turbines Italy Procedura aperta telematica ex art. 60 D.Lgs. 50/2016 per adeguamento IPRM con impianti per il recupero energetico mediante turboespansore e cogeneratore e conduzione/manutenzione degli stessi Italy Italy-Turin: Gas turbines Italy Italy-Bergamo: Gas turbines Italy TF33 STATORS (VANES & SHROUDS) - FA812124R0031 -- 2840 - GAS TURBINES AND JET ENGINES, AIRCRAFT, PRIME MOVING; AND COMPONENTS United States 28--BLADE,TURBINE ENGIN, IN REPAIR/MODIFICATION OF - N0010424QDE09 -- 2835 - GAS TURBINES AND JET ENGINES; NON-AIRCRAFT PRIME MOVER, AIRCRAFT NON-PRIME MOVER, AND COMPONENTS United States
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans