loader

World Tenders & Procurement Opportunities

Noise control services – Post-implementation analyzes of the environmental impact of completed projects involving the construction of the S61 expressway, divided into tasks - 246748-2024

World Biggest Tenders Source

This tender with title Noise control services – Post-implementation analyzes of the environmental impact of completed projects involving the construction of the S61 expressway, divided into tasks - 246748-2024 has been published on Bidding Source portal dated 29 Apr 2024 for the country of Poland. It has been categorized on Environmental Impact Assessment (EIA) services for construction & Noise control services & Environmental impact assessment for construction. For similar tenders you can see tenders mentioned below of this page.

General Information

Noise control services – Post-implementation analyzes of the environmental impact of completed projects involving the construction of the S61 expressway, divided into tasks - 246748-2024
Invitation for Bids
Poland
29 Apr 2024
28 May 2024
English
Environmental Impact Assessment (EIA) services for construction , Noise control services , Environmental impact assessment for construction

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Service of continuous measurement of noise level coming from the airport in D?blin Poland Performing investor supervision over the design and implementation of the task: "Design and construction of devices limiting the acoustic impact on the environment of sections of the S7 and S8 roads, divided into sections: Section 1: S7 from the end of the Radom bypass to the border of the Mazovian Voivodeship; Section 2: S8 from Radziejowice to the border of the Mazovian Voivodeship, with the replacement of window joinery in a residential building" Poland Supervision of construction work - Performing investor supervision over the design and implementation of the task: "Design and construction of devices limiting the acoustic impact on the environment of sections of the S7 and S8 roads, divided into sections: Section 1: S7 from the end of the Radom bypass to the border of the Masovian Voivodeship; Section 2: S8 from Radziejowice to the border of the Masovian Voivodeship, with replacement of window joinery in a residential building Poland Display screens – Delivery of devices for protective technology systems. - 266230-2024 Poland Work environment services - Providing services related to the measurement of factors harmful to health in the work environment (including hygienic assessment), measurements of concentrations of elements or chemical compounds at the workstations of the underground and surface crew of PGG SA Branches, divided into two tasks: Task No. 1: measurements for underground stations Task No. 2: measurements for surface stations - 256745-2024 Poland Work environment services - Providing services related to the measurement of factors harmful to health in the work environment (including hygienic assessment), measurements of concentrations of elements or chemical compounds at the workstations of the underground and surface crew of PGG SA Branches, divided into two tasks: Task No. 1: measurements for underground stations Task No. 2: measurements for surface stations - 250496-2024 Poland Market research services – Preparation of the study "Forecast of the environmental impact of the draft Development Strategy of the Lower Silesian Voivodeship 2030+" - 191552-2024 Poland Poland – Feasibility study, advisory service, analysis – Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Feasibility study, advisory service, analysis - Preparation of a Feasibility Study (together with CBA) together with a Report on the environmental impact of the project, a Report on the disposal of spoil into the sea and auxiliary studies for the Investment entitled "Conducting works to enable water transport to the Outer Port in Świnoujście." - 86585-2024 Poland Environmental impact assessment for construction - Post-investment monitoring of the task "Modernization of the entrance to the inner port (in Gdańsk). Stage IIIA” - 65943-2024 Poland
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans