loader

World Tenders & Procurement Opportunities

FOURNITURE, MONTAGE, ESSAIS ET MISE EN SERVICE D’UNE CHAUDIERE A EAU CHAUDE A LA CENTRALE TAC FERIANA D’UNE PUISSANCE UTILE ENTRE 2500 ET 3000 KW.

World Biggest Tenders Source

This tender with title FOURNITURE, MONTAGE, ESSAIS ET MISE EN SERVICE D’UNE CHAUDIERE A EAU CHAUDE A LA CENTRALE TAC FERIANA D’UNE PUISSANCE UTILE ENTRE 2500 ET 3000 KW. --
SUPPLY, ASSEMBLY, TESTING AND COMMISSIONING OF A HOT WATER BOILER AT THE TAC FERIANA POWER PLANT WITH A USEFUL POWER BETWEEN 2500 AND 3000 KW.
has been published on Bidding Source portal dated 01 Dec 2022 for the country of Tunisia. It has been categorized on Construction work for power plant & Construction works for power plants and heating plants & Boilers & Boiler installations & Water boilers & Hot-water boilers. For similar tenders you can see tenders mentioned below of this page.


SUPPLY, ASSEMBLY, TESTING AND COMMISSIONING OF A HOT WATER BOILER AT THE TAC FERIANA POWER PLANT WITH A USEFUL POWER BETWEEN 2500 AND 3000 KW.

General Information

FOURNITURE, MONTAGE, ESSAIS ET MISE EN SERVICE D’UNE CHAUDIERE A EAU CHAUDE A LA CENTRALE TAC FERIANA D’UNE PUISSANCE UTILE ENTRE 2500 ET 3000 KW.

SUPPLY, ASSEMBLY, TESTING AND COMMISSIONING OF A HOT WATER BOILER AT THE TAC FERIANA POWER PLANT WITH A USEFUL POWER BETWEEN 2500 AND 3000 KW.
Invitation to Bids
22 P 1056
Tunisia
1 Dec 2022
25 Jan 2023
French
Construction work for power plant , Construction works for power plants and heating plants , Boilers , Boiler installations , Water boilers , Hot-water boilers

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

SUPPLY OF MECHANICAL SPARE PARTS FOR THE MAINTENANCE OF WIND TURBINES AT SIDI-DAOUD AND METLINE & KCHABTA WIND POWER PLANTS. - 24 P 1032 Tunisia ACQUISITION OF A BENCH FOR SWEEPING THE SUPERHEATER OF THE STEAM BOILER. - AO07/2024 Tunisia Repair work on the seawater pumping station at the SOUSSE B power plant. - 24 E 4010 Tunisia Awarded - Recruitment of a firm responsible for controlling and supervising the solar power plant construction works market and the rural electrification works market - OP00281246 -- <b>Contract Value: TND 7894.6</b> Tunisia Acquisition, supply, installation and start-up of a steam boiler equipped with a water softener and a softened water tank. Tunisia AAO - Tunisia - Integration of electricity transmission network stations into the telecontrol system - PAERTE -- <h6>Lot No. 1: Telecontrol equipment. The execution time for batch No. 1 is fixed at 16 months (i.e. 480 days). Lot No. 2: Remote transmission equipment. The duration of execution of batch No. 2 is set at 16 months (i.e. 480 days).</h6> Tunisia Supply of spare parts for the electromagnetic valves of the recovery boilers of Central D of the Rades Production Group. Tunisia Acquisition of small and large flow auxiliary steam expansion and desuperheating valves and spare parts for bypass valve for the Sousse Combined Cycle Power Plant. -- <h6>Acquisition de vannes de détente et désurchauffe vapeur auxiliaire petit et grand débit et pièces de rechange pour vanne de contournement pour la Centrale Cycle Combiné Sousse.</h6> Tunisia Development of: Hazard Study of the TAC Goulette 2 Power Plant (lot 1) / Hazard Study of the Thyna Center (lot 2) / Hazard Study of the Fériana Center (lot 3) / Internal Operations… -- <h6>Élaboration de: Étude De Dangers de la Centrale TAC Goulette 2 (lot 1) / Étude De Dangers du Centre de Thyna (lot 2) / Étude De Dangers du Centre de Fériana (lot 3) / Plan d’Opérations Internes du Centre à Cycle Combiné de Ghannouch (lot 4) / Plan d’Opérations Internes de la Centrale de Bouchemma (lot 5) / Plan d’Opérations Internes du Groupement de Production de Sousse (étapes A, B, C et D) (lot 6) / Plan d’Opérations Internes du Centre de Bir M’Cherga (lot 7) / Étude de Dépollution Environnementale du Centre de Thyna (lot 8) / Étude de Dépollution Environnementale du Centrale de Fériana (lot 9) / Actualisation de l’Étude de Dangers de la centrale du Groupement de Production de Rades (étapes A et B) (lot 10) / Actualisation de l’Étude de Dangers du Groupement de Production de Sousse (étapes A, B, C et D) (lot 11) / Actualisation de l’Étude de Dangers du Centre à Cycle Combiné de Ghannouch (lot 12).</h6> Tunisia Tunisia - the design and turnkey construction of two photovoltaic power plants mounted on the ground and connected to the STEG network, on the sites o… Tunisia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans