loader

World Tenders & Procurement Opportunities

Plan to select consultant contractor Works: Building a 22kV loop circuit between Linh Cam 110kV substation (E18.2) and Huong Son 110kV substation (E18.7), improving the reliability of power supply in Huong district area Son, Duc Tho district; Improve the reliability of power supply of medium-voltage power grids in Ha Tinh city and Loc Ha district, Ha Tinh province according to the multi-split-multiple connection (MDMC) scheme.

World Biggest Tenders Source

This tender with title Plan to select consultant contractor Works: Building a 22kV loop circuit between Linh Cam 110kV substation (E18.2) and Huong Son 110kV substation (E18.7), improving the reliability of power supply in Huong district area Son, Duc Tho district; Improve the reliability of power supply of medium-voltage power grids in Ha Tinh city and Loc Ha district, Ha Tinh province according to the multi-split-multiple connection (MDMC) scheme. --
Kế hoạch lựa chọn nhà thầu tư vấn Các công trình: Xây dựng mạch vòng 22kV giữa TBA 110kV Linh Cảm (E18.2) và TBA 110kV Hương Sơn (E18.7), nâng cao độ tin cậy cung cấp điện khu vực huyện Hương Sơn, huyện Đức Thọ; Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Hà Tĩnh và huyện Lộc Hà, tỉnh Hà Tĩnh theo phương án đa chia - đa nối (MDMC).
has been published on Bidding Source portal dated 25 Jul 2022 for the country of Vietnam. It has been categorized on Substation equipment & Power supply accessories & Medium-voltage equipment. For similar tenders you can see tenders mentioned below of this page.


Kế hoạch lựa chọn nhà thầu tư vấn Các công trình: Xây dựng mạch vòng 22kV giữa TBA 110kV Linh Cảm (E18.2) và TBA 110kV Hương Sơn (E18.7), nâng cao độ tin cậy cung cấp điện khu vực huyện Hương Sơn, huyện Đức Thọ; Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Hà Tĩnh và huyện Lộc Hà, tỉnh Hà Tĩnh theo phương án đa chia - đa nối (MDMC).

General Information

Plan to select consultant contractor Works: Building a 22kV loop circuit between Linh Cam 110kV substation (E18.2) and Huong Son 110kV substation (E18.7), improving the reliability of power supply in Huong district area Son, Duc Tho district; Improve the reliability of power supply of medium-voltage power grids in Ha Tinh city and Loc Ha district, Ha Tinh province according to the multi-split-multiple connection (MDMC) scheme.

Kế hoạch lựa chọn nhà thầu tư vấn Các công trình: Xây dựng mạch vòng 22kV giữa TBA 110kV Linh Cảm (E18.2) và TBA 110kV Hương Sơn (E18.7), nâng cao độ tin cậy cung cấp điện khu vực huyện Hương Sơn, huyện Đức Thọ; Nâng cao độ tin cậy cung cấp điện của lưới điện trung áp khu vực thành phố Hà Tĩnh và huyện Lộc Hà, tỉnh Hà Tĩnh theo phương án đa chia - đa nối (MDMC).
Invitation for Bids
20220765203 - 00
Vietnam
25 Jul 2022
10 Aug 2022
Vietnamese
Substation equipment , Power supply accessories , Medium-voltage equipment

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Kế hoạch lựa chọn nhà thầu dự án Cải tạo ĐZ 22kV lộ 461 E28.4 thiết lập mạch vòng với lộ 472 E28.13, 474 E28.13 nâng cao độ tin cậy cung cấp điện phía Đông huyện Văn Lâm -- <br><b>The contractor selection plan for the project of improving the 22kV transmission line 461 E28.4 road to establish a loop circuit with the 472 E28.13 and 474 E28.13 highways to improve the reliability of power supply in the East of Van Lam district</b> Vietnam Kế hoạch lựa chọn nhà thầu dự án Cải tạo ĐZ 479 E28.7 tạo mạch vòng liên lạc với lộ 472, 474 E28.7 nâng cao độ tin cậy cung cấp điện trung tâm thành phố Hưng Yên -- <br><b>The plan to select the contractor for the 479 E28.7 Renovation project to create a communication loop with Highway 472, 474 E28.7 to improve the reliability of power supply in the center of Hung Yen city</b> Vietnam Phê duyệt kế hoạch lựa chọn nhà thầu Gói thầu 01: Cung cấp dịch vụ tư vấn khảo sát thu thập số liệu, lập BCNCKT ĐTXD, TKBVTC – DT và HSMT, Công trình: Đầu tư, cải tạo hệ thống AC/DC và đầu tư trang bị rơle 87B tại các TBA 110kV đang vận hành - giai đoạn 2 -- <br><b>Approval of contractor selection plan Package 01: Providing consulting services, surveying, collecting data, making construction investment feasibility study report, EIA - DT and HSMT, Works: Investment, renovation of AC/DC system and investment Investment in equipping relays 87B at 110kV substations in operation - phase 2</b> Vietnam Hạ tầng kỹ thuật điểm dân cư mới thôn Hoàng Sơn, xã Thái Dương, huyện Bình Giang; Hạng mục: San nền + Giao thông + Thoát nước + Cấp điện + Cấp nước -- <br><b>Technical infrastructure for new residential area in Hoang Son village, Thai Duong commune, Binh Giang district; Categories: Leveling + Traffic + Drainage + Power Supply + Water Supply</b> Vietnam Mua bảo hiểm cháy nổ bắt buộc cho các trạm biến áp 110kV tỉnh Thái Bình năm 2022 -- <br><b>Buying of compulsory fire and explosion insurance for 110kV substations in Thai Binh province in 2022</b> Vietnam Kế hoạch lựa chọn nhà thầu Lắp đặt nguồn cung cấp điện cho bãi container lạnh -- <br><b>Contractor selection plan Installing power supply for refrigerated container yard</b> Vietnam Khu tái định cư xã An Vĩnh Ngãi; Hạng mục: Hệ thống giao thông, hệ thống thoát nước mưa, hệ thống thoát nước thải, hệ thống cấp nước, hệ thống cấp điện, hệ thống cây xanh, đo đạc và cắm cọc phân lô (diện tích còn lại) -- <br><b>Resettlement area in An Vinh Ngai commune; Item: Traffic system, rainwater drainage system, wastewater drainage system, water supply system, power supply system, tree system, measuring and piling of plots (remaining area)</b> Vietnam Vietnam Bids - Kế hoạch lựa chọn nhà thầu Công trình: Xây dựng, cải tạo đường dây trung hạ áp và TBA để giảm tổn thất điện năng, nâng cao chất lượng điện áp, đảm bảo cấp điện mạch vòng, nâng cao độ tin cậy cung cấp điện khu vực thành phố Hà Tĩnh -- <br><b>Project contractor selection plan: Construction and renovation of medium and low voltage lines and substations to reduce power loss, improve voltage quality, ensure loop power supply, and improve reliability of power supply Ha Tinh city area</b> Vietnam Kế hoạch lựa chọn nhà thầu dự án: Hạ ngầm cấp điện, cấp nước sinh hoạt cho KDC BCH Quân sự tỉnh cũ và KDC Đồng Gáo, phường Hội Hợp -- <br><b>Project contractor selection plan: Underground power supply, domestic water supply for the old provincial Military BCH and Dong Gao residential area, Hoi Hop ward</b> Vietnam Cung cấp thiết bị SWT3000 ngăn 273 và Switch số 8 tại tủ N01+NEK (bao gồm dịch vụ cài đặt, cấu hình) - Trạm biến áp 220kV Đông Hà -- <br><b>Supplying equipment SWT3000 compartment 273 and Switch No. 8 at cabinet N01+NEK (including installation and configuration service) - Dong Ha 220kV substation</b> Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans