RENFORCEMENT DES OUVRAGES HYDRAULIQUES ET CREATION D’UN ETAGE DE PRESSION DANS LA LOCALITE DE SIDI HCINE SIJOUMI BRANCHE JAYARA ET ATTAR (GOUVERNORAT DE TUNIS) Fourniture, essais, transport, montage et mise en bon état de marche des équipements d’électrifications pour le poste de transformation de la station de pompage SP4.

World Biggest Tenders Source

This tender with title RENFORCEMENT DES OUVRAGES HYDRAULIQUES ET CREATION D’UN ETAGE DE PRESSION DANS LA LOCALITE DE SIDI HCINE SIJOUMI BRANCHE JAYARA ET ATTAR (GOUVERNORAT DE TUNIS) Fourniture, essais, transport, montage et mise en bon état de marche des équipements d’électrifications pour le poste de transformation de la station de pompage SP4. -- STRENGTHENING OF HYDRAULIC WORKS AND CREATION OF A PRESSURE STAGE IN THE LOCALITY OF SIDI HCINE SIJOUMI JAYARA AND ATTAR BRANCH (GOVERNORATE OF TUNIS) Supply, testing, transport, assembly and putting in good working order of electrification equipment for the substation transformation of the SP4 pumping station. has been published on Bidding Source portal dated 06 May 2022 for the country of Tunisia. It has been categorized on Stage construction works & Substation construction work & Substation equipment & Pumping station construction work & Machines and apparatus for testing and measuring & Miscellaneous evaluation or testing instruments. For similar tenders you can see tenders mentioned below of this page.

STRENGTHENING OF HYDRAULIC WORKS AND CREATION OF A PRESSURE STAGE IN THE LOCALITY OF SIDI HCINE SIJOUMI JAYARA AND ATTAR BRANCH (GOVERNORATE OF TUNIS) Supply, testing, transport, assembly and putting in good working order of electrification equipment for the substation transformation of the SP4 pumping station.

General Information

RENFORCEMENT DES OUVRAGES HYDRAULIQUES ET CREATION D’UN ETAGE DE PRESSION DANS LA LOCALITE DE SIDI HCINE SIJOUMI BRANCHE JAYARA ET ATTAR (GOUVERNORAT DE TUNIS) Fourniture, essais, transport, montage et mise en bon état de marche des équipements d’électrifications pour le poste de transformation de la station de pompage SP4.
STRENGTHENING OF HYDRAULIC WORKS AND CREATION OF A PRESSURE STAGE IN THE LOCALITY OF SIDI HCINE SIJOUMI JAYARA AND ATTAR BRANCH (GOVERNORATE OF TUNIS) Supply, testing, transport, assembly and putting in good working order of electrification equipment for the substation transformation of the SP4 pumping station.
Invitation to Bids
9140/03/22
Tunisia
6 May 2022
9 Jun 2022
French
Stage construction works , Substation construction work , Substation equipment , Pumping station construction work , Machines and apparatus for testing and measuring , Miscellaneous evaluation or testing instruments

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

REPLACEMENT OF THE HT/BT TRANSFORMER STATION OF THE OULED HADJ BOUALEGUE PUMPING STATION (SIDI AICH DELEGATION). - 09610 Tunisia pumping station maintenance work. - 10/2024 Tunisia Contracting and maintaining pumping stations, transformers and electrical tanks. - 44/2024 Tunisia LOT N°1: Creation of OULED BRAHIM departure. LOT N°2: Creation of HTA line departure DOULEB. LOT N°3: Electrification of pumping stations Groupe Chimique Tunisienne Sagui Guebli. LOT N°4: Cr… Tunisia Maintenance and repair work on six (06) decanters of the treatment station in Ezzouhour of the Pumping and Pressure Boosting Stations Service, Northern Water Production Division of the Terri… Tunisia Completion of the second phase development works and equipping the pumping station with electromechanical equipment and testing it in the industrial zone of Mahres in the governorate of Sfax. - 18/2024 Tunisia Maintenance and rehabilitation works of the Chott El Fejjij pumping station and the hydraulic structures of the Gabès Production Division. - 117/2024 Tunisia Maintenance and rehabilitation works of the Chott El Fejjij pumping station and the hydraulic structures of the Gabès Production Division. - 117/2024 Tunisia REPLACEMENT OF THE HT/BT TRANSFORMER STATION OF THE OULED HADJ BOUALEGUE PUMPING STATION (SIDI AICH DELEGATION). - 50-20242pi Tunisia Design, Supply and Construction of the Grombalia2 400/225 kV isolated gas substation (GIS) (including two HT power autotransformers) - Tunisia Tunisia
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans