loader

World Tenders & Procurement Opportunities

KHLCNT đợt 2 Đường dây 500 kV NĐ Vân Phong - NĐ Vĩnh Tân

World Biggest Tenders Source

This tender with title KHLCNT đợt 2 Đường dây 500 kV NĐ Vân Phong - NĐ Vĩnh Tân -- The second phase of the electricity planning and development of the 500kV transmission line Van Phong thermal power plant - Vinh Tan power plant has been published on Bidding Source portal dated 08 Sep 2021 for the country of Vietnam. It has been categorized on Construction work for electricity power lines & Construction works for power plants and heating plants & Construction work for power plant & Thermal power plant construction work. For similar tenders you can see tenders mentioned below of this page.

The second phase of the electricity planning and development of the 500kV transmission line Van Phong thermal power plant - Vinh Tan power plant

General Information

KHLCNT đợt 2 Đường dây 500 kV NĐ Vân Phong - NĐ Vĩnh Tân
The second phase of the electricity planning and development of the 500kV transmission line Van Phong thermal power plant - Vinh Tan power plant
Invitation for Bids
20210661197 - 01
Vietnam
8 Sep 2021
22 Sep 2021
Vietnamese
Construction work for electricity power lines , Construction works for power plants and heating plants , Construction work for power plant , Thermal power plant construction work

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Repair conveyor belt No. 3 to the thermal power plant Vietnam Kế hoạch lựa chọn nhà thầu (đợt 1) các gói thầu vốn Sửa chữa lớn năm 2022 - Công ty Nhiệt điện Duyên Hải -- <br><b>Contractor selection plan (phase 1) for major repair capital packages in 2022 - Duyen Hai Thermal Power Company</b> Vietnam Kế hoạch lựa chọn nhà thầu Dự án: Xây dựng mạch 2 đường dây 110kV cấp điện KCN Nomura Hải Phòng -- <br><b>Contractor selection plan Project: Building a circuit of 2 110kV power lines supplying power to Nomura Hai Phong Industrial Park</b> Vietnam Kế hoạch LCNT Gói thầu SCL01-2023: Tư vấn khảo sát, lập báo cáo đánh giá an toàn mái đào khu vực đường ống áp lực, thiết kế sửa chữa gia cố cải tạo cơ 325m cơ 315m và khu vực đường VH3 TC9 Nhà máy Thủy điện Sông Bung 2 Danh mục SCL năm 2023: Thi công Gia cố mái đào đường ống áp lực, cơ 315 cơ 325m và khu vực đường VH3 TC9 – NMTĐ Sông Bung 2 -- <br><b>LCNT plan SCL01-2023 package: Consulting survey, making report on safety assessment of excavated roof of pressure pipeline area, design, repair, reinforcement, and renovation of 325m engine 315m and VH3 TC9 road area Factory Song Bung 2 Hydropower Plant SCL List in 2023: Construction and reinforcement of roof, digging pressure pipeline, 315 engine 325m and road area VH3 TC9 – Song Bung 2 Hydropower Plant</b> Vietnam Sửa chữa, chống thấm các khu nhà xưởng của Công ty nhiệt điện Sơn Động-TKV -- <br><b>Repairing and waterproofing workshops of Son Dong Thermal Power Company-TKV</b> Vietnam KHLCNT SCL 2023 Tư vấn khảo sát, lập Báo cáo kinh tế - kỹ thuật Đường dây 220kV Pleiku – NMĐ SK An Khê -- <br><b>SCL 2023 Civil Engineering and Construction Consulting, surveying, preparing economic - technical reports 220kV Pleiku - SK An Khe Power Plant</b> Vietnam Danh mục: Công trình Nhà máy thủy điện Sơn La. Hạng mục: Gian máy. Mục: Xử lý thấm thép ốp khuỷu côn hút tổ máy H1 -- <br><b>Category: Son La Hydropower Plant Project. Category: Machine booth. Item: Treatment of permeation of steel for the intake cone of unit H1</b> Vietnam Quyết dịnh điều chỉnh KHLCNT gói thầu di dời đường điện thuộc dự án: Nâng cấp ĐT 741 đoạn từ cầu Thác mẹ đến Quốc lộ 14C, tỉnh Bình Phước -- <br><b>Decision to adjust the plan for adjustment of the construction plan for the power line relocation package under the project: Upgrading DT 741, the section from Thac mother bridge to National Highway 14C, Binh Phuoc province</b> Vietnam E-SCTX18 - 2022: Thay thế, duy tu, bảo dưỡng các mốc bị mất, sơn lại toàn bộ mốc hành lang bảo vệ hồ chứa – Nhà máy thủy điện Sơn La, Lai Châu (Lần 2). -- <br><b>E-SCTX18 - 2022: Replace, maintain and maintain lost landmarks, repaint all landmarks of reservoir protection corridor – Son La Hydropower Plant, Lai Chau (2nd time).</b> Vietnam Di chuyển đường điện cao thế 110kV, 220kV phục vụ GPMB thuộc dự án Bồi thường, giải phóng mặt bằng để thực hiện dự án Đường ven sông kết nối từ đường cao tốc Hạ Long – Hải Phòng đến thị xã Đông Triều, đoạn từ đường tỉnh 338 đến thị xã Đông Triều (Giai đoạn 1) -- <br><b>Relocating 110kV, 220kV high voltage power lines in service of site clearance under the Compensation and site clearance project to implement the project Riverside road connecting from Ha Long - Hai Phong highway to Dong Trieu town, the section from the road province 338 to Dong Trieu town (Phase 1)</b> Vietnam
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans