loader

World Tenders & Procurement Opportunities

e-GP-01 The work consists of Base Course, Bituminous works, Permanent works , Concrete works, Crash barrier and Road Marking.

World Biggest Tenders Source

This tender with title e-GP-01 The work consists of Base Course, Bituminous works, Permanent works , Concrete works, Crash barrier and Road Marking. has been published on Bidding Source portal dated 20 Aug 2018 for the country of Bhutan. It has been categorized on Road barriers & Concrete work & Paving and asphalting works & Erection of road-barriers. For similar tenders you can see tenders mentioned below of this page.

General Information

e-GP-01 The work consists of Base Course, Bituminous works, Permanent works , Concrete works, Crash barrier and Road Marking.
Invitation to Tender
DoR/ROL/Mtc.17/2018-2019/01
Bhutan
20 Aug 2018
18 Sep 2018
English
Road barriers , Concrete work , Paving and asphalting works , Erection of road-barriers

For viewing full details of tenders, you should Log in to your account. If not registered yet, Please Register Now

Or Request a call back now and one of our representatives will contact you. Contact us

Similar Tenders

Pavor Block Pavement works on Lauri GC road Bhutan Blacktopping of Koncholing - Buyang PNH, from Natongla to Buyang (4.2 km) The scope of project includes; Preparation of sub-grade, P & L GSB (L; 4.14 km, W; Half), BT works(L=4.14 km, W=7.5 m) which includes WMM, DBM (60 mm), & AC (40 mm), PW (Retaining walls), drains (4 km), cross drainages (5 nos slab culvert), road markings (30.4 km), & installation of crash barriers (2.2 km). Bhutan Construction of Concrete drain cover at Girina Bhutan Construction of Timber crib wall and plumb concrete toe wall on Nimshong - Shingkhar Gewog connectivity road (Zhemgang). Timber crib Wall - chainage 22.9km (20x2)m, chainage 23.6 (60x3)m Plumb concrete toe wall - chainage 25 & 25.1 km (6.5x1x3)m. Bhutan Bhutan - Construction of PCC pavement for Kamji BHU approach road Bhutan Bhutan - Improvement & Blacktopping of Tingtibi-Phophel PNH (Goling Bypass, Length of Road=3.920 Km) The Works are: Pavement Works (Subgrade preparation and consolidation, GSB= 3.920 Km, WMM= 3.920 Km, DBM=3.920 km & AC= 3.920 km and Permanent Works (V-Drain=3.920 km, crash Barrier Installation= 300 meters and cross drainages (RC Slab Culvert= 2 new plus rectification works for existing culverts) Bhutan Supply of Concrete Mixture Machine for Rigsum Goenba Restoration Project for fiscal year 2022-2023. Bhutan Package - IV (works) Construction of R.C.C. Cantilever Retaining Wall, RRM Wing wall and Plump Concrete wall at Jitti Bridge point. (up & down Stream ) Location 35Km from Samtse. Bhutan ROL/2022-2023/T-01 Construction of Bridge Wing wall (Plum Concrete) at Gongrizam on Kurizampa Gongrizomsa PNH Bhutan DoR/CD/29/2021-2022/FRoad Blacktopping of Tang - Tandingang Farm Road (11.00 km) SH: Pavement Works (WMM & AC) and Permanent Works (V-Drain & Box Drain) Bhutan
No. 12, 1 st floor, Block B2, EGS Business Park, World Trade Center, Bakirkoy - Istanbul - Turkey
info@biddingsource.com
24 X 7 online support
TOP
For viewing latest tenders published for your business in all over the World: Sign in Join free
For accessing full details of Tenders, Kindly choose the Plan that works for you: View Subscription Plans